Generally, most modern kitchen cabinets take between three and sixteen weeks between the time you select them and when they are ready to install, depending on the type of cabinets you want. For instance, if you choose stock kitchen cabinets, they usually can be installed within three to four weeks.

If you choose custom kitchen cabinets, they’ll take between fourteen and sixteen weeks. If you hire an experienced home improvement specialist to install your kitchen cabinets, the project will take less time than a DIY cabinet installation.

What Determines How Long It Takes to Get Kitchen Cabinets?

Understanding the factors that influence the time it takes to order and deliver cabinets will help you plan your installation project so that you can have a new kitchen within the desired time. Here are a few things to keep in mind:

Type of Cabinets

As mentioned, there are two main types of kitchen cabinets in the market: stock cabinets and custom cabinets. Also referred to as ‘in-stock cabinets,’ stock cabinets are produced in mass and are designed for standard kitchen styles and measurements.

These cabinets come in a variety of colors, sizes, and finishes to fit most kitchen styles and sizes. Stock kitchen cabinets are easy to assemble and install because everything is standardized to fit in almost every space. So, if you’re in a hurry to get your kitchen renovated, you should take a serious look at stock kitchen cabinets.

Looking for your dream kitchen?

Our kitchen experts are happy to assist you!
email: [email protected]

Contact Us Now!

Custom cabinets, on the other hand, are cabinets that have been specially designed to match specific styles, tastes, and preferences. These cabinets are meticulously handcrafted with your specifications in mind.

Unlike stock cabinets, custom cabinets are produced in smaller volumes and take longer to finish and install. They also tend to be more expensive than stock cabinets.

However, if you want something unique that will leave your kitchen looking stylish and high-end, then go for custom cabinets. You just have to be a little patient, but can rest assured that the results will be worth the wait. 

How kitchen cabinets are made and the time needed before they can be installed are also influenced by:

The Number of Cabinets Ordered

This is a no-brainer–the more cabinets you need to be installed in your kitchen, the longer it’ll take to get the job done. More cabinets mean more hours of preparation and assembly.

If you want your spacious kitchen filled with custom cabinets within a short time, then you’ll need to hire more people for the project. This will speed up the process, but it can also boost the overall cost of the project.

The Type of Wall Construction

Your kitchen walls will determine how much time your contractor needs to install your kitchen cabinets. If your walls have wood or metal studs, the contractor has to examine each wall to find the studs.

They’ll use these studs to mount the cabinets. Once they find the studs, they have to mark the walls to ensure each cabinet and the screws are aligned with the studs to avoid damaging your walls with unnecessary holes.

This meticulousness takes time and can push the completion date out further, but it reduces the chances an error will be made. Rectifying these errors takes additional time and prolongs the project’s timelines. If you have concrete or brick walls in your kitchen, your contractor won’t have to take time finding studs because the cabinets can be screwed directly into the walls.

27EStore is Your Speedy Solution

27EStore is dedicated to providing top-quality home improvement products. Our expertise and wide selection of kitchen cabinets can shorten the time it takes for you to renovate your kitchen!